Outcome
Ambient RO drinking water and composite-filtered rinse water through a dedicated dual-outlet faucet, with the purifier below the sink.
HydroView+ · Under-sink installation
Plan cabinet space, the dual-outlet faucet, cold-water inlet, reject-water drain, protected power and enough cartridge clearance before any drilling or fabrication.
Installation overview
HydroView+ shares a working cabinet with the trap, valves, stored items and tubing, while its dedicated faucet changes the worktop above.
Ambient RO drinking water and composite-filtered rinse water through a dedicated dual-outlet faucet, with the purifier below the sink.
The 165 mm-wide body is 381 mm deep and 435 mm high. It must fit around the trap and valves with extra height to lift out both cartridges.
Plan the cold-water inlet and isolation, RO reject-water drain, dedicated faucet and protected electrical supply as one installation.
HydroView+ is ambient-only. Agree the faucet, drain, power and service route before drilling so the clean worktop does not hide a cramped cabinet.
Six site checks
Cabinet dimensions alone do not reveal traps, valves, shelves, bins, concealed services or the movement needed for filter changes.
Take one wide image and close views of the trap, valves, rear wall, power, shelves, bins and proposed appliance position.
Confirm the 165 × 381 × 435 mm body fits without loading plumbing, blocking isolation valves or losing cartridge-lift clearance.
Identify a suitable cold-water connection with isolation and a secure falling route for RO reject water. Protect every tube from kinks and stored items.
Check whether an existing opening can be reused or a new hole is required. Confirm worktop material, clearances below and who is authorised to drill.
Use a properly earthed, accessible supply suitable for the appliance and the below-sink environment. Keep plugs and connections away from leaks and standing water.
Physically demonstrate the lift and turning space for both cartridges after all pipework and stored items are returned to the cabinet.
Installation record
Clear measurements and connection photographs make the installation serviceable long after the cabinet doors close.
Keep the home type and general area, open-cabinet measurements, worktop material, model, faucet position, inlet, drain, power, proposed date and approvals.
Obtain owner, landlord, JMB/MC, cabinet-maker or worktop-contractor approval before drilling or altering plumbing. Public image consent is separate.
Run both faucet outputs, inspect for leaks and reject-water flow, operate the isolation valve, prove cartridge removal and record the final tubing route.
After installation
The owner should know which output is which, how to isolate the appliance and what access must never be blocked.
Keep proof of purchase, model and serial details, the final faucet and cabinet record and warranty information.
Replace at capacity or time, whichever comes first: CF 4,000 L or 12 months; RO 8,000 L or 24 months.
If flow, taste, leakage or drain behaviour changes, photograph the faucet and open cabinet before disturbing tubing, then contact Velta Malaysia.
Installation and service
Share a worktop view, a fully open cabinet photograph, measurements and close images of the trap, valves, power and proposed faucet position.