Velta partners · Malaysia projects

Water purifiers for residential and commercial projects.

Velta supports product selection, technical planning, installation coordination and owner handover from the first brief to completion.

Who we work with

Support for every project stage.

Velta works with interior designers, renovation teams, residential developers, hospitality, workplaces and wellness spaces.

01

Interior design and renovation

Protect counter depth, cabinet access, faucet position, services and future filter work before fabrication closes the options.

02

Residential development

Choose one appliance setup, then document the installation and handover for every unit.

03

Hospitality and workplace

Match water output to the people using the space, then plan refill, CO₂, cleaning, filters and support.

04

Clinical and wellness spaces

Choose the appliance, source water and specialist workflow that suit how the space will be used each day.

How we support your project

Brief, check, coordinate and hand over.

Early agreement on water output, product, space and services keeps installation and owner support coordinated through completion.

01

Brief

Define the user, water output, daily volume, project stage, target date and what the appliance should replace or enable.

02

Test

Check dimensions, clearances, inlet, reject-water drain, power, faucet, refill, heat, weight and future service access.

03

Coordinate

Agree what is included, when the site will be ready and who will handle cabinetry, plumbing, electrical work and installation.

04

Hand over

Record the exact device, serial, purchase date, warranty, matching consumables or cleaning plan and the local support route.

Request the project pack

Put the appliance requirements in the drawing set.

We prepare it for the model and project at hand using current Malaysia product information.

Request the project pack
  1. 01Current model, finish and Malaysia price overview
  2. 02Product dimensions, weight and output
  3. 03Counter, cabinet and operating-clearance notes
  4. 04Water inlet and RO reject-drain requirements
  5. 05Power, faucet, refill, CO₂ and heat considerations
  6. 06Filter, cleaning, warranty and service plan
  7. 07Relevant manuals, technical data and supporting documents
  8. 08Owner handover, warranty and service information

Technical requirements

Plan the complete appliance space.

Check the footprint, water, drain, power, faucet, refill and service access required for each Velta model before finalising joinery.

01

Countertop sparkling water purifier

HydroSpark+

220 × 508 mm footprint, 21.7 kg appliance, 2,250 W, tank or compatible connected mode, plus filter, CO₂ and waste access.

View product details →
02

Connected countertop water purifier

HydroForm+

180 × 425 mm footprint with cold-water inlet, reject-water drain, 2,100 W heating load and service clearance.

View product details →
03

Under-sink water purifier

HydroView+

Cabinet body, dedicated faucet, inlet, reject-water drain, protected power and vertical cartridge-removal path.

View product details →
04

Malaysia-only countertop purifier

HydroFirst+

233 × 424 mm footprint and 10.0 kg body; no plumbing, with a 5 L source tank, purified-water pitcher, reject-water handling, power and filter access.

View product details →
05

Countertop hydrogen water machine

Hhuhu

223 × 476 mm footprint, rear 3 L tank access, compatible purified source water, power and fortnightly cleaning route; no plumbing.

View product details →
06

Specialist oxyhydrogen device

HydroVitality

Confirm the current Malaysia model, placement, accessories, operating plan and servicing requirements through consultation.

View product details →

Start a project

Send the project details.

Share the project type, stage, location, target water output, preferred model and completion date.

01Project type and general Malaysia location
02Design or construction stage
03Target water output or preferred model
04Plans, elevations or clear site photos
05Water, drain, power and fabrication constraints
06Quantity, target handover date and decision owner

Send the brief to hello@velta.my. The team will confirm current pricing, availability, lead time, what is included and the commercial terms for the project.

For partners

Plan Velta into your project.

Share the intended water output, site information and handover date to begin product selection and technical planning.

Start a partner conversation