← All installation guides

HydroSpark+ · Countertop installation

Installing HydroSpark+ on a kitchen counter.

Plan the counter depth and load, power, refill or connected water mode, waste-water handling, filter access and CO₂ changes before the appliance arrives.

Placement
Countertop
Footprint
220 × 508 mm
Machine weight
21.7 kg
Water modes
Sparkling, cold, ambient and hot

Installation overview

A compact front does not tell the whole space story.

Depth, working clearance and the route chosen for water and waste determine whether HydroSpark+ remains convenient after installation.

01

Outcome

One countertop appliance for sparkling, cold, ambient and hot filtered water, with a front dispensing zone that must stay clear.

02

Primary constraint

The 220 mm-wide body is 508 mm deep and weighs 21.7 kg. Check the full counter, overhead cupboard and front vessel space.

03

Connection choice

Use the 5 L source tank and waste tank, or plan a suitable cold-water inlet and drain for a connected arrangement.

04

Ongoing access

Leave room to refill or remove tanks, replace the 4-in-1 filter, change CO₂ and clean the drip tray without moving the machine.

Six site checks

Confirm the complete operating space.

Measure the appliance and every action the owner must perform around it.

01

Measure the full zone

Record counter width, 508 mm machine depth, height below overhead units, front dispensing room and any door or drawer conflicts.

02

Verify the supporting surface

Confirm the worktop is level, stable and suitable for the 21.7 kg appliance plus full tanks and the dispensing vessel.

03

Choose tank or connected mode

For tank mode, plan carrying and refilling the 5 L source tank and emptying the waste tank. For connected mode, confirm a cold inlet, isolation and drain route.

04

Protect the working clearance

Keep ventilation, top controls, front dispense area and the route used to lift or remove tanks free after cupboards and small appliances are in place.

05

Prove service access

Demonstrate that the filter, CO₂ cylinder, source tank, waste tank and drip tray can each be reached and removed safely.

06

Check electrical capacity

Use an accessible, properly earthed 220–240 V outlet suitable for the published 2,250 W load. Do not trap the plug behind the machine.

Installation record

Document decisions before delivery.

A useful planning record keeps the owner, installer and future service team aligned.

01 · Site facts

Record the measured fit

Keep the home type and general area, counter dimensions, appliance model, chosen tank or connected mode, proposed date and the people approving the works.

02 · Written approval

Agree plumbing and placement

Where drilling, plumbing or shared-property rules apply, obtain written owner, landlord, JMB/MC or contractor approval before work begins. Public image permission is separate.

03 · Handover

Prove the daily routine

Demonstrate filling, dispensing, waste-water emptying, filter and CO₂ access. Record any adjustment while the route and measurements are still visible.

After installation

Make the first week predictable.

Complete the registration, upkeep explanation and support handoff while the setup is fresh.

01 · Register

Keep purchase and machine details

Retain the proof of purchase, model and serial details, installation record and warranty information.

02 · Maintain

Set filter and cleaning reminders

Follow the appliance prompt and replace the 4-in-1 filter at its stated capacity or time limit. Keep the tanks and tray clean.

03 · Support

Photograph before changing the setup

If performance, leaking, drainage or CO₂ behaviour changes, record the display and connection area before moving parts, then contact Velta Malaysia.

Installation and service

Confirm the counter and connection plan with Velta Malaysia.

Share clear wide and close photographs, exact measurements, the proposed power point and whether you prefer refill or connected operation.